**Document:** Planning Officer Report
**Application:** 03/00394/B — Erection of a wind turbine
**Decision:** Permitted
**Decision Date:** 2003-07-17
**Parish:** Lezayre
**Document Type:** report / officer_report
**Source:** https://planningportal.im/a/73195-lezayre-andreas-road-dhoor-wind-turbine/documents/1397938

---

# Planning Officer Report

## Application No: 30394 ### Planning Report and Recommendations #### General Report **Site Visited** **YES/NO** The application is for the creation of 25 m pile with a small wind turbine on top (approx. 1 metre diameter) adjacent to an existing stable block in Lezaye. The turbine is required to provide power for lighting and electric fencing, particularly during the darker months. The turbine is relatively small, unattractive and should be encouraged as an environmentally friendly energy source. The proposal is acceptable. **Signed** A. Adhikari **Date** 9/7/83 #### Summary of objections / views - Lezaye - ch - All - ch #### Recommendations **Approved/Refused** **Approved** **Signed** A. Adhikari **Date** 9/7/83 [Table omitted in markdown export]

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/73195-lezayre-andreas-road-dhoor-wind-turbine/documents/1397938*