**Document:** Planning Approval Decision Notice
**Application:** 09/01400/B — Construction of a 30 bed hotel development with a retail unit and 45 cover restaurant & bar with associated parking provision
**Decision:** Permitted
**Decision Date:** 2010-08-20
**Parish:** Lezayre
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/64396-lezayre-land-bounded-by/documents/1395044

---

# Planning Approval Decision Notice

## The Town and Country Planning (Development Procedure) Order 2005

Cornerstone Architects
79 Parliament Street
Ramsey
Isle Of Man
IMB 1AQ
In pursuance of powers granted under the above Act and Order the PLANNING COMMITTEE of the Department of Infrastructure does hereby APPROVE the following application made on behalf of:

Name: $\quad$ Seymar Developments Ltd
Proposal: $\quad$ Construction of a 30 bed hotel development with a retail unit and 45 cover restaurant \& bar with associated parking provision
at: Land Bounded By Park Road, Premier Road
And Mooragh Promenade
Ramsey
Isle Of Man
which was considered on 22nd July 2010, subject to compliance with the conditions specified below.

Date of Issue: 20th August 2010
Murray House
Mount Havelock
Douglas

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.
2. This approval relates to the construction of a 30 bed hotel development with a retail unit and 45 cover restaurant \& bar with associated parking provision as proposed in the submitted documents and drawings 1544/06/01 REV A, 1544/06/02, 1544/06/03 REV A, 1544/06/04 REV B, 1544/06/05 REV A, 1544/06/06 REV A, 1544/06/07 REV A, 1544/06/08 REV A, 1544/06/09 REV A and 1544/06/10 REV D received on 21st August 2009 and 10th December 2009.

3. Prior to the commencement of any works, samples of the external finishes of the building must be submitted to and approved by the Planning Authority, and thereafter the works must be carried out in accordance with the approved samples.

4. No development shall take place until full details of both hard and soft landscaping works have been submitted to and approved in writing by the Planning Authority and these works shall be carried out as approved. Details of the hard landscaping works include footpaths and hard surfacing materials. The hard landscaping works shall be completed in full accordance with the approved details prior to the first occupation of the hotel, retail unit or restaurant hereby permitted. All planting shall be carried out in accordance the approved details in the first planting and seeding seasons following that first occupation. Any trees or shrub which within 5 years from the completion of the development dies, is removed or becomes seriously damaged or diseased shall be replaced in the next planting season with another of similar size and species unless the planning authority gives written consent to any variation.

5. Any proposals for external signage must form the subject of a separate application under The Control of Advertisement Regulations 2005.

6. Prior to the commencement of any works on site, a detailed scheme for the translocation of the Subterranean Clover, Suffocated Clover, Rough Clover and Knotted Clover from the site must have been submitted and approved by the Planning Authority and thereafter the translocation must be carried out in accordance with the approved scheme.

7. No development may commence on site until the Planning Authority has agreed a method statement for the construction of the proposed development. Such method statement should include details of the hours of operation, the construction traffic and parking arrangements and the operation of any building compound.

8. The bar/restaurant shall only be open to the public between the hours of 09:00am and 01:00am the following day on any Monday, Tuesday, Wednesday, Thursday, Friday and Saturday and between the hours of 09:00am and 23:30pm (inclusive) on any Sunday.

9. The ground floor retail unit may be used for any purpose within Class 1 ("Shops") of Schedule 4 of the Town and Country Planning (Permitted Development) Order 2005; any other use must form the subject of a separate planning application.

This decision was made by the Planning Committee constituted in accordance with Article 3(1) of the Town and Country Planning (Development Procedure) Order 2005.

---

**Guidance Note** This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005. Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/dlge/planning/plan/applications/decision.xml

09/01400/B

Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

The proposed development must not be commenced until either;

- The time for requesting an appeal has expired; or
- Any appeal has been determined;

Whichever is the later.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/64396-lezayre-land-bounded-by/documents/1395044*
