**Document:** Planning Approval Decision Notice
**Application:** 09/00050/B — Alterations and extensions
**Decision:** Permitted
**Decision Date:** 2009-02-23
**Parish:** Braddan
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/62254-braddan-17-copse/documents/1368375

---

# Planning Approval Decision Notice

## Isle of Man Town and Country Planning Act 1999

### The Town and Country Planning (Development Procedure) Order 2005

Dave Luton Design
Engine House Studio
Agneash
Lonan
Isle Of Man
IM4 7NS

In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Mr & Mrs David Hardinge
**Proposal:** Alterations and extensions
**at:** 17 Copse Hill
Douglas
Isle Of Man
IM2 1ND

which was considered on 19th February 2009, subject to compliance with the conditions specified below.

**Date of Issue:** 23rd February 2009

Murray House Mount Havelock Douglas
Secretary to the Planning Committee

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This approval relates to the submitted drawings H/42/1, H/42/2 and H/42/3 all received on 14th January, 2009.

3. The windows to be formed in the north west facing and south east facing elevations of the extension shall only be glazed or re-glazed with obscure glass.

4. No facing and roofing materials shall be used other than materials similar to those used on the existing building.

This decision was made by the Acting Senior Planning Officer in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.

### Guidance Note

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan/applications/decision.xml

Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;

Whichever is the later.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/62254-braddan-17-copse/documents/1368375*
