**Document:** Planning Approval Decision Notice
**Application:** 10/01654/B — Extension of existing flues
**Decision:** Permitted
**Decision Date:** 2010-12-23
**Parish:** Braddan
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/37355-braddan-continent-8-house-extension/documents/1362421

---

# Planning Approval Decision Notice

## The Town and Country Planning (Development Procedure) Order 2005

**Prospero Building Maintenance**
**Tower House**
**Castle Street**
**Douglas**
**IM1 2EZ**

In pursuance of powers granted under the above Act and Order the Department of Infrastructure does hereby **APPROVE** the following application made on behalf of:

**Name:** Continent 8 Technologies PLC
**Proposal:** Extension of existing flues
**at:** Continent 8 House
Middle River Industrial Estate
Douglas
Isle of Man
IM2 1AL

which was considered on 22nd December 2010, subject to compliance with the **conditions** specified below.

**Date of Issue:** 23rd December 2010

**Murray House**
**Mount Havelock**
**Douglas**

**Mr. P. Faragher**
Deputy Secretary to the Planning Committee

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This approval relates to the extension of existing flues, as shown in drawing numbers GA0001, GA0100 and GA0101, date stamped 8th November 2010.

This decision was made by the Senior Planning Officer in accordance with the authority delegated to her under Article 3(13) of the Town and Country (Development Procedure) Order 2005.

## Guidance Note

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/transport/planning/plan/applications/decision.xml

Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

The proposed development must not be commenced until either;

- The time for requesting an appeal has expired; or
- Any appeal has been determined;

Whichever is the later.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/37355-braddan-continent-8-house-extension/documents/1362421*
