**Document:** Highways Division Response Email
**Application:** 12/01216/B — Erection of a garage extension with living accommodation over
**Decision:** Permitted
**Decision Date:** 2012-12-11
**Parish:** Malew
**Document Type:** consultation / highways_response
**Source:** https://planningportal.im/a/3325-malew-plot-21-extension-garage/documents/1278724

---

# Highways Division Response Email

From: Fletcher, Hazel
Sent: 21 September 2012 11:48
To: Balmer, Chris; Callow, Jo (DOI); Chance, Jennifer; Connan, Marie; Corlett, Sarah; Davy, Laura; Holmes, Anthony; Leadbeater, Jamie; McKnight, Melissa; Stanley, Steven (DOI)
Subject: Planning Responses
Attachments: Message from KM_C280_619711@GOV.IM

### PA 12/01175/B Approval in principle for the conversion and extension of existing stores / maintenance building to create web hosting centre, Greenhill Centre Isle Of Man Business Park, IM2 2QZ

The application meets relevant highway standards and policies. If the building is to be replaced then the current parking standard must be maintained.

### PA 12/01215/B Erection of a garage extension with living accommodation over, Plot 18 Poachers Pocket Development Bridge Road Ballasalla Isle Of Man

The driveway in front of the garage is less than 6m long and its use is likely to result a vehicle overhanging the shared surface highway on a bend contrary to the interests of highway safety. The application fails to meet the standard of 2 off road parking spaces for a dwelling.

If the application is approved then the garage should be retained for use as vehicle storage.

### PA 12/01216/B Erection of a garage extension with living accommodation over, Plot 21 Poachers Pocket Development Bridge Road Ballasalla

This application meets relevant highway standards and policies

### PA 12/01240/C Additional use of exhibition hall as a multi functional centre, Old Corn Mill Mines Road, Laxey IM4 7NL

I have received additional information from the applicant (attached) and the application provides adequate car parking for the proposed facilities. There are facilities to for coaches to turn and coach parking in the vicinity; there are disabled spaces provided. The facilities are also accessible on foot from public car parking in the vicinity.

### PA 12/01243/B Alterations including re-surfacing works and installation of seating, lighting bollards and gullies to connect to existing drainage, Georges Lane, Castletown

This application meets relevant highway standards and policies

**Hazel Fletcher**
Traffic Engineer
Highways Division
Department of Infrastructure
Sea Terminal Building, Douglas, Isle of Man, IM1 2RF

Tel: 01624 686639
Fax: 01624 686905

infrastructure
bun-troggalys

1

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/3325-malew-plot-21-extension-garage/documents/1278724*
