**Document:** Officer Planning Report July 18
**Application:** 11/00802/B — Installation of solar panels to dwelling
**Decision:** Permitted
**Decision Date:** 2011-07-25
**Parish:** Lezayre
**Document Type:** report / officer_report
**Source:** https://planningportal.im/a/1148-lezayre-tholt-y-will-house-dwelling/documents/1250346

---

# Officer Planning Report July 18

[Table omitted in markdown export] The previous planning application is considered relevant in the assessment and determination of this application:- Alterations and replacement windows - 11/00468/B - APPROVED Change of use from holiday apartments to residential dwelling - 09/00194/C – APPROVED ### Representations Lezayre Parish Commissioners have made the following comments:- "Approve" The Planning Authority has received no privately written representations objecting to the proposal. ### Assessment In terms of planning policies within the Strategic Plan Energy Policy 4 is the most relevant to consider. This states:- "Development involving alternative sources of energy supply, including wind, water and tide power, and the use of solar panels, will be judged against the environmental objectives and policies set out this Plan. Installations involving wind, water and tide power will require the submission of an EIA." The proposed solar panels and alterations are all very minor proposals which are not apparent from public view. They would all be appropriate and in keeping with the existing property and would not significantly affect the character and appearance of the street scene or the surrounding in general. It is judged that the environmental improvements outweigh the visual impact caused by the proposed development. Given the dwelling's position, orientation and distance from neighbouring properties the proposal would have no adverse impact upon nearby residential amenities. ### Recommendation Overall, for these reasons the proposals would be appropriate in thIs location and therefore the application is recommended for approval. ### Party Status It is considered that the following meet the criteria of Government Circular 1/06 and should be afforded interested party status: Lezayre Parish Commissioners ### Recommendation Recommended Decision: Permitted Date of Recommendation: 15.07.2011

Conditions and Notes for Approval / Reasons and Notes for Refusal C : Conditions for approval

N : Notes attached to conditions
R : Reasons for refusal
- : Notes attached to refusals

C 1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

C 2. This approval relates to the installation of solar panels to dwelling as proposed in the submitted documents and drawings 1700 02 P01 and 1700 02 P02 all received on 13th June 2011.

I confirm that this decision accords with the appropriate Government Circular delegating functions to Director of Planning and Building Control / Senior Planning Officer.

Decision Made : Permitted Date : 1917/11

Signed : 
Michael Gallagher
Director of Planning and Building Control
Delete as appropriate

Signed : 
Jennifer Chance
Senior Planning Officer

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/1148-lezayre-tholt-y-will-house-dwelling/documents/1250346*
