**Document:** Decision Notice 11/00320/B
**Application:** 11/00320/B — Installation of two additional windows at first floor level
**Decision:** Permitted
**Decision Date:** 2011-05-06
**Parish:** Malew
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/672-malew-new-units-installation-windows/documents/1244987

---

# Decision Notice 11/00320/B

## Isle of Man Town and Country Planning Act 1999

### The Town and Country Planning (Development Procedure) Order 2005

BRW Architectural
Beaconsfield Cottage
Richmond Hill
Braddan
Isle Of Man
IM4 1JG

In pursuance of powers granted under the above Act and Order the Department of Infrastructure does hereby **APPROVE** the following application made on behalf of:

**Name:** Salamander Services Ltd
**Proposal:** Installation of two additional windows at first floor level
**at:**
Unit 1
New Units
Balthane Industrial Estate
Balthane
Ballasalla
Isle Of Man
IM9 2AX

which was considered on 3rd May 2011, subject to compliance with the conditions specified below. **Date of Issue:** 6th May 2011 Murray House Mount Havelock Douglas

Mrs C Dudley
Deputy Secretary to the Planning Committee

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This permission relates to the installation of two windows as shown in drawings reference 11/18/01 received on 7th March 2011 and 11/18/02 Rev A received on 29th March 2011.

## Guidance Note

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/transport/planning/plan/applications/decision.xml

Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;

Whichever is the later.

---