**Document:** Drainage Division Response
**Application:** 05/92430/B — Creation of a new vehicular access to replace existing
**Decision:** Permitted
**Decision Date:** 2006-03-07
**Parish:** Marown
**Document Type:** consultation / highways_response
**Source:** https://planningportal.im/a/79857-marown-land-relating-to-replacement/documents/1215858

---

# Drainage Division Response

## Isle of Man

Government

The Secretary,
Planning Committee
Department of Local Government
and the Environment,
Murray House,
Douglas.

Contact: Ian Wade
Our ref:
Your ref:

## Drainage Division

Meary Veg
Balnahowe, Santon
IM4 1HL
Telephone (01624) 693511
Fax (01624) 693502
Email Ian.Wade@gov.im

8th February 2006

Dear Sirs,

**PA 05/92430/B – Creation of a new vehicular access to replace existing, Land relating to Marown Manor and Marown Court Main Road Glen Vine, Marown.**

The plans for the proposed development have been inspected and the Drainage Division of the Department of Transport requests that the following comment(s) be passed to your Planning Committee: -

### NO OBJECTION In principle subject to:

1) The applicant is required to carry out a CCTV survey of the existing foul sewer which crosses the development site prior to any work commencing. Once development work has been completed on site, a further CCTV survey must be undertaken to ensure that no damage has been caused to the public foul sewer during these works. Copies of these CCTV surveys must be submitted to the Drainage Division for scrutiny.

If any damage is found to the public foul sewer during construction work being carried out, the applicant or his contractor will be liable for the repair of the same.

2) The applicant must submit full structural calculations to the Division relating to the retaining wall prior to work commencing on site.

3) There must be NO discharge of surface water (directly or indirectly) from this proposed development to any foul drainage system(s) so as to comply with the requirements of the Department of Transport Drainage Division and the Sewerage Act 1999.

Cont...

Cont...

4) Public foul sewage crosses this site. The line of the foul sewer must be identified before development work commences. The public sewer must be fully protected whilst all building works are being carried out. No trees may be planted within three metres of any public sewer either at the time of construction or at any time in the future.

In the event that this application is approved I should be grateful if these comments could be incorporated in the approval notice. Yours faithfully,

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/79857-marown-land-relating-to-replacement/documents/1215858*