**Document:** Officer Planning Report
**Application:** 04/00199/B — Installation of a fuel tank and dispensing unit on
**Decision:** Permitted
**Decision Date:** 2004-05-05
**Parish:** Rushen
**Document Type:** report / officer_report
**Source:** https://planningportal.im/a/75263-rushen-alfred-pier-breakwater-quay-fuel-tank-dispensing/documents/1193792

---

# Officer Planning Report

**Application No.:** | 04 / 00199 / B | | :-- | :-- | |
**Applicant:** | Harbours Division | |
**Proposal:** | Installation of a fuel tank and dispensing unit on | |
**Site Address:** | Alfred Pier Breakwater The Quay Port St. Mary IM9 5EA | ### Considerations Case Officer : Fiona Mullen
**Expected Decision Level:** Committee Decision ### Written Representations We have received 1 private representations for this application. ### Consultations Consultee : Highways Division Notes: no adverse traffic impacts Consultee : Port St Mary Commissioners Notes: no objections ### Policy

### Officer's Report

It is proposed to locate a fuel tank and dispenser pump at the Alfred Pier, Port St Mary, adjacent the lighthouse.

An objection to the development states that the tank should be located underground, and whilst I consider this would be the most acceptable solution, I also consider that as an engineering option, this would prove difficult to achieve. In addition, by placing above the ground it would also be easily removed when required.

Nick Black has advised that he considered the proposal to be unobjectionable, and whilst the tank and pump would be visible, I consider the proposal to be acceptable.

### Recommendation

Recommended Decision : Permitted

## Conditions and Notes for Approval / Reasons and Notes for Refusal

C : Conditions for approval
N : Notes attached to conditions
R : Reasons for refusal
- : Notes attached to refusals

C 1 . The development hereby permitted shall commence before the expiration of four years from the date of this notice.

C 2 . This approval relates to the plans and information submitted as part of this application, date stamped 3rd February 2004.

### Decision Made : 30/4/04 <br> Committee Meeting Date :

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/75263-rushen-alfred-pier-breakwater-quay-fuel-tank-dispensing/documents/1193792*
