**Document:** Planning Approval Decision Notice
**Application:** 03/00897/B — Erection of a three storey dwelling with integral garage to replace existing
**Decision:** Permitted
**Decision Date:** 2003-10-20
**Parish:** Rushen
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/73634-rushen-boathouse-garage-shore-house-replacement-garage/documents/1185333

---

# Planning Approval Decision Notice

## Isle of Man Planning Scheme (Development Plan) Order 1982

Guy J Thompson<br>The Old Paint Shop<br>Athol Street<br>Port St Mary<br>IM9 5DS

In pursuance of powers granted under the above Acts and Order the Department of Local Government and the Environment does hereby APPROVE the application made by you on behalf of: Miss Davenport

Proposal: Erection of a three storey dwelling with integral garage to replace existing
at: $\quad$ Boathouse/garage, Shore House
Shore Road
Port Erin
which was considered on 16 October 2003, subject to the compliance with the conditions or modifications specified on the attached schedule.

Date of Issue: 26 October, 2003
Murray House
Mount Havelock
Douglas
Isle of Man
Secretary Planning Committee
Note 1: This permission refers only to that required under the Town and Country Planning Acts and does not include any consent or approval under any other enactment, bylaw, order or regulation.

Note 2: No works may be commenced until such time as -

- the time for requesting a review of the initial decision has expired; or
- any review of the initial decision has been completed; or
- the time for requesting an appeal in relation to the decision has expired; or
- any appeal has been completed.

Note 3: Rights of the review of the decision are attached.

## Schedule Of Conditions

Application Ref No: 03/00897/B

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.
2. This approval relates to drawing number: 55.1 .03 and 56.2 .03 , submitted and date stamped 24th July 2003.
3. There must be no discharge of surface water to the main foul sewer.
4. The proposed development must be connected to the main foul sewer.

NOTE: A Drainage Connection Fee will be payable to the Drainage Authority on this development
5. The roof(s) must be finished in dark natural slate.

NOTE The applicant is advised to consult the Water Authority with regard to the Water Supply Byelaws.

This decision was made by the Planning Committee constituted in accordance with Paragraph 2 of Schedule 1 of the Isle of Man Planning Scheme (Development Plan) Order 1982.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/73634-rushen-boathouse-garage-shore-house-replacement-garage/documents/1185333*