**Document:** Planning Approval Notice 10/00261/B
**Application:** 10/00261/B — Erection of two polytunnels
**Decision:** Permitted
**Decision Date:** 2010-05-17
**Parish:** German
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/35794-german-dreem-faaie-ballacraine-st-johns-polytunnel/documents/1179180

---

# Planning Approval Notice 10/00261/B

## The Town and Country Planning (Development Procedure) Order 2005

Mr Paul Allanson
Dreem Faaie
Ballacraine
St Johns
Isle of Man
IM4 3LS

In pursuance of powers granted under the above Act and Order the Department of Infrastructure does hereby APPROVE the following application made on behalf of:

Name: Mr Paul Allanson
Proposal: Erection of two polytunnels
at: Dreem Faaie
Ballacraine
St Johns
Isle of Man
IM4 3LS
which was considered on 17th May 2010, subject to compliance with the conditions specified below.

Date of Issue: 17th May 2010

Murray House
Mount Havelock
Douglas

### Schedule Of Conditions:

1. The use must be taken up within four years of the date of this notice in order for this approval to remain valid after that time.
2. This approval relates to the erection of two polytunnels at Dreem Faaie, Ballacraine, St. John's as shown on drawing numbers LP/10 PALL, SP2/10 PALL, NL/10 PALL, TBD/10 PALL, PO1/10 PALL and PO2/10 PALL, date stamped 26th February 2010.

This decision was made by the Senior Planning Officer in accordance with the authority delegated to her under Article 3(13) of the Town and Country (Development Procedure) Order 2005.

## Guidance Note

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/ dlge/planning/plan/applications/decision.xml

Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

The proposed development must not be commenced until either;

- The time for requesting an appeal has expired; or
- Any appeal has been determined;

Whichever is the later.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/35794-german-dreem-faaie-ballacraine-st-johns-polytunnel/documents/1179180*
