**Document:** Certificate of Lawfulness
**Application:** 25/00491/LAW — Certificate of Lawful Development for installation of roof light
**Decision:** Certificate of Lawful Use/Devel Approved
**Decision Date:** 2025-06-13
**Parish:** German
**Document Type:** decision / certificate_of_lawfulness
**Source:** https://planningportal.im/a/34168-st-johns-11-slieau-installation-roof/documents/1087024

---

# Certificate of Lawfulness

Reference: 25/00491/LAW

#### Town And Country Planning Act 1999 Certificate Of Lawful Use Or Development

The Department of Environment, Food and Agriculture hereby certifies that on the 16th May 2025, the operation described in Schedule 1 to this certificate in respect of the land specified in Schedule 2 to this certificate and edged REDon the plan attached to this certificate, was lawful within the meaning of section 24 of the Town and Country Planning Act 1999 for the following reason(s):

1) There is sufficient evidence demonstrating that the rooflight has been in situ since 2010.

- Schedule 1. Uses/Development to which this Certificate relates

For the installation of a rooflight

- Schedule 2. The land to which the Certificate relates

11 Slieau Whallian Park St Johns Isle Of Man IM4 3JH

Date 13th June 2025 This decision was made by a Principal Planner under the delegated authority afforded by Government Departments Act 1987.

J SINGLETON

J Singleton MRTPI Principal Planner

Notes

- 1. This certificate is issued solely for the purpose of section 24 of the Town and Country Planning Act 1999.
- 2. It certifies that the operation specified in Schedule 1 taking place on the land described in Schedule 2 was lawful, on the specified date and, thus, was not liable to enforcement action under section 26 of the 1999 Act on that date.
- 3. This certificate applies only to the extent of the operations described in Schedule 1 and to the land specified in Schedule 2 and identified on the attached plan. Any operations which is materially different from that described or which relate[s] to other land may render the owner or occupier liable to enforcement action.

|7<br><br>65<br><br>13<br><br>67<br><br>19<br><br>17<br>18<br><br><br>1<br><br>66<br><br>8<br><br>6<br><br>Und<br><br>14<br><br>Slieau Whallian Park<br><br>Def<br><br>Reproduced from the IoM Survey map with the permission of the Department of Infrastructure © Crown Copyright 2015. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.<br><br>Certificate of Lawfulness<br><br>|Scalebar:<br><br>| | | |
|---|---|---|
<br><br>0 5 10 20<br><br>Metres|
|---|
<br><br>Department Division/Office Case Reference<br><br>Date<br><br>DEFA<br><br>Isle of Man Government<br><br>13/06/2025<br><br>|Scale:1:500|
|---|
|
|---|

D

k

![A technical site plan showing numbered property boundaries and building footprints in red and green lines, with an Isle of Man Government header.](https://images.planningportal.im/2025/05/7140635.png)

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/34168-st-johns-11-slieau-installation-roof/documents/1087024*