**Document:** Decision Notice
**Application:** 25/10023/AIR — Information in relation to condition 2 of PA 22/01472/B detailing the Construction Environmental Management Plan (CEMP) and the Grassland Protection Methodology at Cringle Impounding Reservoir
**Decision:** Permitted
**Decision Date:** 2025-03-24
**Parish:** Malew
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/33711-malew-cringle-impounding-reservoir/documents/1080886

---

# Decision Notice

MANX UTILITIES AUTHORITY MANX UTILITIES AUTHORITY PO BOX 177 DOUGLAS IM99 1PS

TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019

In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by MANX UTILITIES AUTHORITY, Ref 25/10023/AIR, for the Information in relation to condition 2 of PA 22/01472/B detailing the Construction Environmental Management Plan (CEMP) and the Grassland Protection Methodology at Cringle Impounding Reservoir at Cringle Impounding Reservoir Corlea Road Ballasalla Isle Of Man .

Any details or notes which apply to the approval are set out below.

This application hereby approved relates to documents and drawings titled: Application Form, Pre-tender Construction Environment Management Plan (CEMP), Appendix B Grassland Translocation Advice_Technical Note, Appendix C - Grassland Protection Methodology_Plan

NOTE In this instance of the submitted drawings and documentation provided and after consultation with the Case Officer from the original application, who is happy with the level of detail, it is deemed sufficient to achieve the desired outcome and would be considered satisfactory for the planning condition 2 of application 22/01472/B, under the understanding that the development shall not be carried out unless in accordance with the approved details.

Date of Issue: 24th March 2025

J CHANCE Director of Planning and Building Control

Guidance Note

This decision was made by the Head of Development Management in accordance with the authority delegated to them.

All correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services) or at the Department’s off ices Murray House, Mount Havelock, Douglas, https://pbc.gov.im/onlineapplications/

This decision refers only to that applied for under The Town and Country Planning (Development Procedure) Order 2019.

There is no appeal against this decision.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/33711-malew-cringle-impounding-reservoir/documents/1080886*
