# APL Plan Statement

Attn Paul Visigah
Planning Division,
Department of Environment, Food and Agriculture,
Murray House,
Mount Havelock,
Douglas
IM1 2SF
27th March 2021

Dear Paul

RE: PA 17/00852/B Ballaglonye Main Road Crosby – Minor amendment application

Please find attached the following drawings:

Existing drawings:
17/002576/ 15 Rev E Site Plan 1 of 3
17/2576/27 rev C Site plan 3 of 3
17/2576/105 rev F Retail Unit
17/2576/300 rev A Site Location Plan and Boundary

Proposed drawings:
17/002576/15 Rev W Site Plan 1 of 3
17/2576/27 rev K Site plan 3 of 3
17/2576/105 rev K Retail unit
17/2576/300 rev D Site Location and Boundary

17/2576/64 rev B Retaining wall to rear of plots 17 to 21
17/2576/81 rev C Wall between plots 17 and 22
17/2576/306 rev A Bin Store
17/2576/900 rev E Site Plan Costa

Amendments have been made to the approved scheme and comments have been added here to the letter that accompanied the planning application in blue as follows:

Retail Unit
1. The Roller shutter door to the service yard of the retail unit has been omitted.
The omission of this roller shutter door is an improvement to the scheme and has less impact on the neighbouring properties than the personnel door that has replaced it.
2. The extent of Manx Stone to the frontage of the retail unit has been increased.
The additional stone has little overall impact and does not detract from the visual aspects of the elevation. The previous approved glazing is reduced in extent.
3. An ATM has been added to the frontage of the retail unit.
The ATM was added at the request of the Co-operative Society who are to be the tenants of the unit. This is a facility for the public and will be a very useful addition for the community.

4. The Entrance doors have been relocated to the Co-op unit.
The doors are glass as and have little visual impact being relocated. This amendment was to facilitate the layout of the shop internally and could not have been envisaged at the initial design stage as the tenant was not in place at that time.

5. The double entrance doors have been amended to the costa unit to a single door.
Costa do not require a double door and the door is glass and so the impact will be negligible.

6. The door initially indicated at first floor level has been moved to the end east elevation.
The door is for access to the area forming the canopy and was obstructed to the front elevation by structural bracing. The door is glass and is visually unobtrusive.

7. A balustrade has been added to the entrance canopy at first floor level.
The entrance canopy is to be used for maintenance and repair of the glass façade. Under the CDM regulations a guard or protection must be fitted to allow access.

8. A Stone wall and ramp access has been added to the east side of the Costa unit adjacent to the footpath with a metal balustrade on the wall 1100mm in height.
The stone wall is approximately 900mm in height and will have a balustrade over to protect from falling. This area was not fully detailed at the design stage and is merely design development. The balustrade is to protect from falling, especially children with the stream being adjacent.

9. The Car parking layout has been amended to accommodate more cars.
It became apparent when laid out that there was a better solution to the car parking and there is no additional tarmac involved.

10. Tree numbers to the front of the site have increased to 11 from 8.
Additional trees were planted which is an improvement to the visual amenity.

11. The cladding to end east elevation has changed to aluminium in anthracite grey.
The finish is better quality and marries with the under cladding of the canopy to create a more harmonious appearance.

### Landscaping

12. A Retaining wall has been added to the rear of plots 22 to 28 and 17 to 21 with a hedge included between the fence and retaining wall. The hedge was previously included in the landscape proposals.
The retaining wall ranges from 800mm to 1.5m at the highest point and forms the rear wall to plots 17 to 21. The wall was constructed to level the rear gardens of plots 22 to 28. The approved Landscaping scheme shows a hedge to the rear of these gardens and there is a hedge planted between the retaining wall at high level and the garden fence.
This still complies with the landscaping condition and the wall is not above 1.5m in height therefore would be within permitted development rights.

13. A wall has been added to the boundary of the landscaped area between plots 17 and 22. The landscaping is unaffected.
The wall forms the side boundary to plots 22 and 17 and is bounded by a landscaped area in accordance with the Landscape Condition. This wall is not higher than 1.8m and is setback from the road and therefore is within permitted development rights. It is better than a fence in our opinion aesthetically.

### General Items

14. A 6m x 6m Garage has been added to plot 15.
This is a standard double garage and would normally be within permitted development rights.

15. A balancing pond has been added in lieu of underground water storage.
This balancing pond is in lieu of an underground water attenuation system. It also allows for a greater capacity and therefore is a better option than a fixed underground system. It has

also been agreed with the MUA Drainage Department as part of the Surface water works for the site has a whole.

16. The surface water is to be discharged into the Curraghs area in lieu of directly into the River Dhoo as agreed with the MUA.

The pipe that was originally shown discharging directly into the River Dhoo has been omitted and the scheme is a better environmental solution as it does not drain the Curraghs area and enhances it instead.

17. A drainage ditch has been constructed to the periphery of the site to accommodate direct water runoff and divert the water from the front of the site. This was agreed with the MUA when constructed. This has the added benefit of not discharging water into the stream at the bridge on the main road thereby reducing the amount of water coming down the stream in times of peak rainfall.

The drainage ditch is covered under the section 8 drainage and diverts water that originally ran in a ditch to the side of the Peel road.

18. The foul water drainage has been amended to discharge into the sewage treatment works when the upgrade is undertaken. This part of the work has been agreed with the MUA but not yet fully completed.

This was a condition that the foul sewer be connected to the sewage treatment works. I have added it here for completeness as it is a requirement of the planning consent that it is connected. The scheme shows the route to Old Church Road.

If you have any queries on the above, please do not hesitate to contact me.

Yours sincerely,

Mark Pearce

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/23655-crosby-crosby-meadows-estate/documents/1030161*