**Document:** Decision Notice
**Application:** 16/01291/B — Replacement of an existing lamp post with an antenna topped lamp post with associated equipment cabinets
**Decision:** Permitted
**Decision Date:** 2017-02-07
**Parish:** Braddan
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/22839-braddan-sure-site-near-replacement/documents/1026651

---

# Decision Notice

Sure (IOM) Ltd Atlantic House Circular Road Douglas IM1 1AG

TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013

In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Sure (IOM) Ltd, Ref 16/01291/B, for the Replacement of an existing lamp post with an antenna topped lamp post with associated equipment cabinets at Sure Site, Near Junction With Lakeside Road Hailwood Avenue Douglas Isle Of Man subject to compliance with the following condition(s) and notes (if any) :

- 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.

Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.

- 2. In the event that the mast and equipment cabinets hereby approved become redundant or are no longer needed, the mast and equipment cabinets and stone walls hereby approved shall be removed within a period of 90 days. Reason: In the interest of protecting the character and appearance of the area.
- 3. The lamppost mast hereby approved shall, within 28 days of its installation, be coloured grey to match the existing lampposts on Hailwood Avenue unless otherwise agreed in advance with the Department. Reason: In the interest of the character and appearance of the area.

The development hereby approved relates to the following drawings, all date-stamped as having been received 12th December 2016: 24/010C, 24/012E, 24/013E, 24/014C and 24/015C.

Date of Issue: 7th February 2017

## Director of Planning and Building Control

Guidance Note

This decision was made by the Planning Committee in accordance with the authority delegated to it in the name of the Minister and/or in the name and on behalf of the Department.

This permission refers only to that required under the The Town and Country Planning (Development Procedure)(No 2) Order 2013.

Any appeal against this decision must be in accordance with the criteria set down in that instrument.

Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain:

-  Payment of a planning appeal fee as prescribed in the Town and Country Planning (Application and Appeal Fees) (No2) Order 2016 (currently £170);
-  The reasons for making the appeal; and
-  An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation.

An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planningapplications/planning-appeals/how-to-appeal/

The proposed development must not be commenced until either;

-  The time for requesting an appeal has expired; or
-  Any appeal has been determined;

Whichever is the later.

If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House.

A copy of the Officer’s report and any correspondence which led to the assessment and decision is now available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas.

https://www.gov.im/planningapplication/services/planning/search.iom

Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/22839-braddan-sure-site-near-replacement/documents/1026651*
